Powering the World’s Largest CSP Project

Harnessing the power of the sun, Noor Energy 1 delivers round-the-clock clean energy through advanced CSP and PV technology, ensuring a sustainable and carbon-free future for Dubai.

Safety

Quality

Schedule

About Us

Noor Energy 1 is a pioneering 950MW hybrid solar project, combining Concentrated Solar Power (CSP) and Photovoltaic (PV) technologies to provide sustainable, reliable, and cost-effective energy. As the largest single-site CSP plant in the world, our project supports the Dubai Clean Energy Strategy 2050, reducing carbon emissions by 1.6 million tons annually while powering over 320,000 homes.

Core Values

Zero Harm to People

Ensuring the safety and well-being of our employees, contractors, and the community.

Zero Damage to the Environment

Minimizing our environmental impact through responsible and sustainable practices.

Zero Damage to Assets

Protecting infrastructure and resources through rigorous safety protocols and risk management.

Zero Non-Compliance

Adhering strictly to legal, regulatory, and industry standards to uphold the highest levels of integrity and accountability.

Dubai

Location

USD 4.529 BN

Lorem ipsum dolor sit amet

Q1 2024

Commercial Operation Date

44 square KM

Project Area

Mission

With the support of global stakeholders, industry expertise, and team spirit, we are committed to safely developing and operating the world’s largest CSP plant with uncompromised quality, ensuring non-stop clean energy for the next 35 years.

Vision

To be the world’s largest renewable energy platform, delivering reliable and uninterrupted clean power to Dubai while driving a sustainable and greener future.

Our Technologies

Central Tower

The solar power tower, also known as a central tower or heliostat power plant, is one of the most advanced forms of Concentrated Solar Power (CSP). It utilizes thousands of movable mirrors (heliostats) to track the sun and direct sunlight onto a collector tower. This concentrated energy heats molten salts stored in the tower, which can retain heat for extended periods, enabling power generation even after sunset. This continuous energy supply makes it a highly efficient and sustainable solution for large-scale renewable energy production.

Parabolic Trough

The parabolic trough system is designed to maximize solar energy collection by tracking the sun’s movement from East to West. Curved mirrors focus sunlight onto heat-absorbing tubes that contain high-temperature Heat Transfer Fluid (HTF), which is heated up to 393ºC. This thermal energy is either used immediately to generate steam for electricity production or stored in molten salt tanks for later use. The steam produced powers turbines in a Rankine regenerative cycle, ensuring a steady and reliable electricity supply. The integration of Auxiliary PV systems further enhances energy availability during the day.

Photovoltaic

To complement CSP, Noor Energy 1 integrates an advanced Photovoltaic (PV) system with bifacial monocrystalline PV modules that absorb sunlight from both the front and back sides, increasing energy efficiency. With a total capacity of 250MW, this PV system is divided into two facilities: 217MWac within the Central Tower Unit and 33MWac within the Parabolic Trough Unit. The energy generated is efficiently connected to the 400kV Intermediate Substation, ensuring seamless integration into Dubai’s power grid while supporting the Dubai Clean Energy Strategy 2050

Our Shareholders

ACWA Power

ACWA Power is the developer, investor and operator of power generation and desalinated water plants with 54 assets in operation, construction or advance development across 11 countries employing over 3,500 people with ~60% local employment. ACWA Power’s portfolio, with an investment value in excess of USD 45 billion, can generate 30 GW of power and produce over 5.3 million m3 /day of  desalinated water.

Dubai Electricity and Water Authority

Dubai Electricity and Water Authority (DEWA) was formed on 1 January 1992 by a decree issued by the late Sheikh Maktoum bin Rashid Al Maktoum to take over and merge the Dubai Electricity Company and the Dubai Water Department that had been operation independently for several years until then. Both organizations were established in 1959 as government-supported bodies with the objectives of making available to the people of Dubai an adequate  and reliable supply of electricity and water. Dewa employs a workforce of over 10,000 employees and provides over 725,000 customers with electricity and water.As of year end 2014 (where statistical data is available) DEWA has an installed energy capacity of 10 GW. As of date DEWA is rated BBB/Baa1 by S&P/Moody’s

Silk Road Fund

Silk Road Fund Co., Ltd is a medium to long term investment fund established in December 2014 in Beijing. As an important vehicle to implement China’s initiative of the Silk Road Economic Belt and 21st Century Maritime Silk Road (Belt and Road initiative), the Fund makes outbound investment in diverse geographic areas outside in China. The committed funding by the Chinese government is USD 40 Billion, with an initial disbursement of USD 10 Billion. With openness, inclusiveness, and mutual benefit as its core values, the Fund is committed to providing financial support to cross-broader economic and trade cooperation and connectivity.

Partners

Our Records

Tallest concentrated solar power tower

The tallest concentrated solar power tower is 263.126 m and was achieved by Dubai Electricity and Water Authority (DEWA) & Noor Energy 1 (both UAE) in Dubai, UAE, on 29 May 2023.

Largest thermal energy storage plant

The largest thermal energy storage plant is 5,907 MW/h and was achieved by Dubai Electricity and Water Authority (DEWA) and Noor Energy 1 (both UAE) in Dubai, UAE, on 25 June 2023.

Our Impact

Carbon Emission Reduction

By replacing fossil-fuel-based power with renewable solar energy, Noor Energy 1 helps prevent 1.6 million tons of CO₂ emissions annually. This significant reduction in greenhouse gas emissions aligns with the Dubai Clean Energy Strategy 2050, driving the transition towards a low-carbon economy and a more sustainable future for generations to come.

 Clean Energy Supply

With a total capacity of 950MW, our hybrid solar plant generates enough 24/7 renewable energy to power over 320,000 homes in Dubai. The combination of Concentrated Solar Power (CSP) and Photovoltaic (PV) technology ensures a consistent and reliable energy supply, even after sunset, reducing dependency on traditional energy sources and promoting energy security.

Economic Growth & Job Creation

As one of the largest renewable energy infrastructure projects in the region, Noor Energy 1 contributes to Dubai’s economic growth by generating employment opportunities across various sectors. The project facilitates knowledge transfer, helping to develop local expertise in solar energy technologies, and strengthens the UAE’s position as a global leader in renewable energy.

Technological Innovation

Noor Energy 1 is home to the world’s tallest CSP Central Tower (263.12m) and the largest thermal energy storage system (5,907 MWh), setting new benchmarks in renewable energy innovation. Our advanced molten salt storage technology enables energy generation even at night, ensuring continuous power supply and proving that solar energy can be a dependable, round-the-clock solution for large-scale power needs.